Don't miss an insight. Subscribe to Corrosionpedia for free.

Subscribe
Question

How can I convert corrosion rate between mils per year and mm/y?

Answer
ByOsvaldo Mejia |Last updated: January 31, 2022

Acorrosion rate conversionis a technique to change the measurement units of a givencorrosion rateto another unit for comparison purposes or a specific engineering application. When converting a corrosion rate between these units you must keep in mind that a mil is a thousandth of an inch (i.e., a thousand mils equals one inch) and that one inch equals 25.4 millimeters:

1000 mils = 1 inch = 25.4 mm

Hence, one millimeter equals 39.37 mils:

1 mm = 1000 mils/25.4 mm = 39.37 mils

So, to convert a given corrosion rate from mm/y to mils/y, you must multiply by 39.37

and, to convert a given corrosion rate from mils/y to mm/y, you must divide by 39.37

Note: mils per year (mm/y) is often known as themils penetration per yearand abbreviated as mpy.

Conversion examples:

  • A corrosion rate of 0.10 mm/y is equals to what in mpy?

0.10 mm/y * 39.37 mils/mm = 3.94 mpy

  • What is the equivalent of 5 mpy in mm/y?

5 mils/y / 39.37 mils/mm = 0.13 mm/y

Having the corrosion rate expressed in the appropriate unit of measurement is important because unit consistency facilitates calculating the remainingservice lifeof an asset. For example, if your equipment wall thickness is measured in inches and your corrosion rate in mm/y, and you want know how long it will take corrosion to consume a certain amount of wall thickness (thewall loss), then you will need to first convert the corrosion rate to mpy, and then to inch/y, before making the calculation. (To learn more about conversions, read相关系数osion Rate Conversion: Simple Ways to Convert Data Between Common Corrosion Units.)

Share this Q&A

  • Facebook
  • LinkedIn
  • Twitter

Tags

相关系数osion 相关系数osion Testing Procedures 腐蚀过程 相关系数osion Management 相关系数osion Monitoring Measurement General Procedures Engineering and Spec Writing Asset Management

Written byOsvaldo Mejia| Sr. Pipeline Integrity Engineer at Petroleum Development Oman

Profile Picture of Osvaldo Mejia


Osvaldo Mejia currently serves as a Sr. Pipeline Integrity Engineer at Petroleum Development Oman (PDO) LLC. He has over 15 years of experience designing and implementing corrosion control programs, risk based inspection and maintenance strategies, and conducting fitness for service evaluations and integrity assessments of assets for the oil & gas, process and petrochemical industries.

He is the author and lecturer of various training courses related to corrosion control, risk management and integrity management. He has authored and lectured various technical papers at national and international conferences and technical seminars. He is an approved NACE instructor for the Pipeline Corrosion Integrity Management (PCIM), In-Line Inspection (ILI), Direct Assessment (DA), Cathodic Protection Tester (CP1) and Cathodic Protection Technician (CP2) courses.

More Q&As from our experts

Related Terms

Related Articles

Term of the Day

Adhesion Test Failure

An adhesion test failure refers to the failure of a coating to adhere to a substrate when its adhesive strength is tested...
Read Full Term

Don't miss the latest corrosion content from Corrosionpedia!

Subscribe to our newsletter to get expert advice and top insights on corrosion science, mitigation and prevention. We create world-leading educational content about corrosion and how to preserve the integrity of the world’s infrastructure and assets.

Resources
Go back to top